Erskine House

Autumn 2017-2018

Main Contractor: Graham Construction

J&S McKee Ltd undertook a full supply and fix package including all site clearance, bulk excavation, pile mat, sheet piling, temporary works design and installation, excavations, steel fixing, concrete, and drainage up to and including ground floor slab. This was a site with very limited access in the heart of the city centre, with one way street access only on one side for removal of bulk ground excavation (5000M3) , and delivery of steel and pipework for 320m sheet piling management, 32 cast insitu suspended manholes and 720m of suspended drainage, reinforced concrete sub-structure.

This 8 Storey city centre building will have ground floor retail units with office accommodation above.

Piles
Piles in place
Working in close confines
Excavation of site
Diggers at work
Concrete stripped off piles
Siteworks
Main support bases
Pipework
Steels
Piles cut ready for steel to go down
Membrane in place
Pile driving
Steelwork
Steelwork in place
Steelwork for floors
Steels in place ready for concrete
Steels 2
Steel work
Steel in place
Steel for reinforced concrete boundary
Site ready for concrete
Steels
Membrane laying
Membrane and steels
Concrete pumping to structure
A LOT of steel
Concrete poured for reinforced floor
Concrete pump going
Erskine House exterior picture