Allstate NI Piling commencing

Allstate NI

Allstate NI

Location: Belfast
Contractor: O’Hare and McGovern

Description

&S McKee Ltd successfully completed the groundworks and reinforced concrete substructure for a 6-storey office building designed by WDR & RT Taggart Architects for Allstate NI.

Our scope included:

  • Full site clearance
  • Reduced level excavations
  • Construction of the piling mat
  • Installation of main drainage systems
  • All reinforced concrete sub-structures

This project was carried out on a very confined urban site, located between the main railway line at Lanyon Place and the River Lagan in Belfast, requiring meticulous planning and precise execution.